Company: DP World Canada Role: Project & Operations Coordinator Duration: May 2023 - March 2025 Industry: Terminal Logistics/ Port Operations Methodology: Waterfall/ Continous Improvement Tools Used: IBM Maximo, PowerBI, Excel
Problem
My Role
Embedded within the operations team at one of Canada's largest port terminals, I led maintenance optimization and asset management initatives, combining project coordination with hands-on data analysis to drive measurable improvements in terminal efficiency, reporting accuracy, and system adoption.
Key Actions
Led maintenance workflow optimization initatives using IBM Maximo, identifying process gaps, and redesigning workflows to reduce response times and improve maintenance scheduling across the terminal
Designed and deployed Power BI KPI dashboards monitoring equipment performance, maintenance response times, and workflow utilization providing operations leaders real-time visibility to enable faster, evidence-based decisions
Conducted annual asset inventory audits across the full terminal operation, achieving 95% asset tracking accuracy and implementing data governance standards to sustain reporting accuracy over time
Managed vendor relationships and cross-functional project workstreams, aligning procurement, operations, and IT stakeholders to deliver transformation initiatives on schedule
Served as IBM Maximo system superuser, developing training materials and upskilling operational staff improving system adoption and data quality across teams
Impact
Achieved 95% asset tracking accuracy across terminal operations through structuted auditing and data governance implementation.
Improved terminal maintenance efficiency by 15% through IBM Maximo workflow redesign and process optimization
Delivered real-time Power BI dashboard adopted by operations leadership for day to day deicision making
Improved IBM Maximo adoption across operational teams through structured training and system superuser support
Aligned procurement, operations, and IT stakeholders across multiple concurrent workstreams, all delivered on schedule
Key Takeaway
This project demostrates my ability to drive operational transformation in complex, high-stakes environment by combining project governance with hands - on data capabilities to deliver measurable efficiency gains and build the reporting and build the reporting infrastrure that makes sustained improvement possible